Completed Projects

Cook Children’s Medical Center

Cook Children’s Medical Center

The North Bed Tower expansion project was completed in 2012. The five story structure (and basement) included the addition of over 150 patient beds for the ever expanding hospital. This 270,000 square foot project included an expansion of the existing Central Utility Plant with the addition of one 1250 ton chiller, two cooling towers, two chilled water pumps, two condenser water pumps, piping and controls. A new North Parking Garage was built concurrently with the other two projects and brought the total project cost for the mechanical and plumbing work to over $22 million.  

TCU Brown Lupton University Union

TCU Brown Lupton University Union

The TCU student union facility is the cornerstone of campus activities. SkiHi teamed with Linbeck (construction managers), CCRD – Dallas (MEP engineers) and Hahnfeld Architects in constructing this multi-use facility completed in 2006. Students can dine in several food courts, study in relaxing open areas and attend formal dinners served by the modern kitchens within the facility. This three-story structure has garnered several awards for excellence in both the design and construction industry.